
Our Projects
Precision Engineering: KLA Tencor Building 1 Cleanroom
AlfaTech delivered full design services for the conversion of a copy center into a Class 100 cleanroom, including AMC filtration, HVAC upgrades, utility trenching, and secure workspace reconfiguration to protect sensitive IP.
Advancing Aerospace Innovation: Collins Aerospace Testing Facility
AlfaTech delivered MEP engineering design for Collins Aerospace’s relocated testing facility in Anaheim, CA. Key features include acoustically isolated PODs achieving 30 dBA noise levels, high-efficiency systems, and optimized layouts supporting sensitive testing operations and dual subsidiary use in a renovated high-bay warehouse.
Subaru Research & Development Facility
AlfaTech provided mechanical, electrical, and plumbing engineering design services for the tenant improvement of Subaru’s 17,500 SF R&D Facility.
Advanced Micro Devices (AMD): Pioneering Engineering Excellence
AlfaTech provided MEP engineering for AMD’s Sunnyvale campus, supporting over 1M SF of offices, labs, and cleanrooms, including the 50,000 SF Commons Building with dining, fitness, and conferencing. Projects focused on energy efficiency, flexible infrastructure, and employee wellness.
Maxim Integrated Circuits Expansion: Engineering and Architectural Excellence
AlfaTech provided MEP engineering services for Maxim Integrated’s 20,000 SF X3 Fab cleanroom expansion in San Jose, delivering high-performance Class 1 and Class 1000 spaces, upgraded utility infrastructure, and code-compliant modifications to support advanced semiconductor manufacturing.
Bently Heritage Distillery - Iconic Creamery Building
AlfaTech provided MEP and sustainable design services for the Bently Heritage Distillery Creamery Building renovation in Minden, NV. This LEED Gold project blends historic architecture with modern distillation technology. Featuring energy-efficient systems, adaptive reuse, and innovative design, it honors industrial heritage while enhancing production efficiency and sustainability.
Bently Heritage Distillery, The Iconic Mill Building
AlfaTech provided sustainable MEP design for the historic 14,700 SF Mill Building at Bently Heritage Distillery in Minden, NV. Featuring radiant systems, energy-efficient lighting, and a gravity-fed distillation process, the LEED Gold facility blends heritage with cutting-edge green design.
Delta Americas Headquarters: A Sustainable Showcase
Provided sustainable MEP design for Delta Products' 250,000 SF LEED Platinum, Net Zero Energy headquarters in Fremont, CA. The campus features geothermal systems, radiant floors, natural ventilation, solar PV, and rainwater harvesting—showcasing Delta’s commitment to innovation and environmental stewardship.
ASML San Jose Campus Relocation
AlfaTech provided MEP design for ASML’s 200,000 SF San Jose campus, featuring advanced lab and clean room facilities, a data center, offices, café, and fitness center. The project supports semiconductor R&D with Class 1000 and 10,000 clean rooms, high-performance computing, and sustainable, flexible building systems.
Oracle, Santa Clara Campus: Advancing Innovation
Explore the future of innovation at Oracle Santa Clara Campus with AlfaTech's MEP engineering excellence. From cutting-edge testing facilities in Building SC-09 to collaborative workspaces in Building SC-10, our expertise transforms spaces. Discover the seamless integration of Smart building technology, shaping a connected and intelligent environment for the next wave of innovation.